Park Meadows Metropolitan District  
                   
  Projects          
                 
 

The District partners with Lone Tree and Douglas County to provide major capital improvements to and along arterial and collector streets to benefit District residents and property owners.  The District's current projects are shown below in following order.

Under Construction
Pending Construction
Under Design
Pending Design
Under Study
Completed

   
                   
 
 
       City of  Lone Tree 2017 Capital Budget  
 
 
  Master Intergovernmental Agreement between Park Meadows Metropolitan District and City of Lone Tree Regarding Public Improvements.

       PMMD Master IGA with City of Lone Tree

     Addendum-1 (Eastbound I-25 Ramp at Lincoln)

     Addendum-2 (Parkway Drive Reconstruction)

     Addendum-3 (Northbound Right Turn Lane at Yosemite and Park Meadows Drive)

     Addendum-4 (Yosemite and Park Meadows Drive - The Yard)

Through 2015 the cumulative amount of shared costs for cooperative projects among the District, City and/or County totaled $29,476,979 of which $10,039,022 represents the District’s portion.

 
                   
         PMMD 5-Year Capital Improvement Plan  
     
         PMMD 5-Year Capital Recommendations by the City of Lone Tree  
     
  This article was included in the Summer 2013 City of Lone Tree Timberlines newsletter sent to all residents and businesses. It contains a brief summary of recent PMMD cooperative projects with the City.

  COLT Newsletter Summer 2013

 
  Enclosed is a chronology of major District projects and activities from 1993 to 2008.

       2008 District Chronology

 
             
 

The PMMD Project Map shows the cooperative projects built by The District, Lone Tree and Douglas County.

       PMMD-COLT Cooperative Project Map

       PMMD-2017 Project List

 
                   
 
 
                   
  Under Construction          
                     
  The following projects have been approved by the Board, funded, designed and are currently under construction.
                     
  Lincoln Leaf Pedestrian Bridge   2016-2017 [Details]  
               
  [Back]            
                     
                     
                   
  Pending Construction          
                     
  The following projects have been approved by the Board but are not yet under construction.
                     
  Median Rehabilitation/Tuckpoint Repair Project
To be done annually March-September
       
                     
  [Back]                  
                     
                     
                   
  Under Design          
                     
  County Line Southbound Off-Ramp Hard Right Turn Lane   2018    
                     
      County Line / Park Meadows Center Drive Signal   2018    
                     
      ● Yosemite Landscape Median (Park Meadows Drive to C-470)   2017    
             
  [Back]                  
                     
                     
                   
  Pending Design          
                     
  Project finalization and priority will be determined based upon future fund availability.  These projects are still in the discussion phase and have not yet been approved by the District Board.  
                     
  County Line Road Landscaped Medians
  County Line Road Median Landscape Study - I-25 to Quebec Street
       
             
                     
  [Back]                  
                     
                     
                   
  Under Study  
                     
  County Line Road Transportation Study
(Yosemite to Inverness Drive S.) - Douglas County 2015 / 2016
       
                 
  C470 Widening with Toll Lanes (Wadsworth to I-25) TBD        
                     
  Grade Separated Multi Modal Pedestrian Bridge over Yosemite Street
at C470 (2019)
PMMD Letter to Douglas County Dept of Public Works C470 Grade Separated Trail

PMMD Letter to Douglas County Dept of Public Work County Line Road Improvements

 
                     
                     
  [Back]                  
                     
                     
                   
  Completed          
                     
  Yosemite Right Turn Lane at Park Meadows Drive   2016 [Details]  
             
  Parkway Drive Reconstruction (Acres Green to County Line Rd.)   2016 [Details]  
                     
  Sunningdale Blvd Median at Lone Tree Parkway   2016 [Details]  
                     
           
  Parkway Drive (Acres Green to County Line Road) Median Landscape Improvements
COLT Valerian Proposed Agreement Parkway Drive Reconstruction
PMMD Brickman Proposal for Parkway Drive Design Landscape
PMMD Chancery Proposal for Parkway Drive Median Improvements
PMMD Brickman Proposal for Parkway Drive Landscape Install
2016 [Details]  
                     
  Park Meadows Drive Reconstruction Construction Plan Improvements (Acres Green to Quebec) Landscaped Medians
COLT Valerian Proposed Agreement Park Meadows Drive Medians
2014 [Details]  
                     
  Right of Way C-470 /Yosemite Interchange Landscape Improvements    (North Side)
PMMD Technologies Constructors Contract Landscape Improvements
2014 [Details]  
                     
  Yosemite and Lincoln Landscape Medians
“Tuck-Point” Repair/Replacement.
  Masonry Evaluation & Recommendation 2012-2016
  2014 [Details]  
                     
  Landscaped ROW on East Side of Park Meadows Center Drive
from East Mall Entrance to County Line / I-25 Interchange.
  2014    
                     
  Acres Green Landscaped Median Reconstruction
(Parkway Drive to County Line Road)
  2014    
               
  Pedestrian Lights on West Side of Yosemite
(Lincoln to Park Meadows Drive)
  2014 [Details]  
               
  Pedestrian Lights on East Side of Yosemite
(Maximus to Park Meadows Drive)
    2014    
               
  PF Chang's Turn Pocket -  River Rock Installation $3,000   2013    
               
  Park Meadows Drive Reconstruction
(Acres Green to Quebec)
$300,000   2013    
               
  C470/Yosemite Bridge Painting $50,000   2013    
               
  PF Chang's Turn Pocket $20,000   2013    
               
  Timberline Medians Enhancements $180,000   2012 [Details]  
               
  Parkway Drive Reconstruction  (Joint project with Lone Tree) $250,000   2012 [Details]  
               
  Parkway Drive (Acres Green to Bozarth Way) Landscaped Median
COLT TM Landscaping Enterprises Inc.Contract Bid
$187,000   2012    
               
  Pedestrian lights on the South side of Lincoln. $300,000   2011 [Details]  
               
  Water Conservation Program $36,560   2010 [Details]  
               
  Sunningdale Traffic Calming:
Street improvements totaling $364,000 are being shared equally by Lone Tree and PMMD, and PMMD is committing an additional $88,400 for landscaping and streetscape improvements.
$364,000   2010 [Details]  
               
  Park Meadows Drive Landscaped Medians from Acres Green Dr. to Yosemite St. $307,000   2010 [Details]  
               
  Intersection communication and coordination technology upgrades.  An additional $38,530 was received from the Denver Regional Council of Governments for this project. $34,500   2009    
               
  Traffic count devices located at Mall Entrances $45,000   2009    
               
  Pedestrian lights on the North side of Lincoln

$270,000

  2009    
               
  Quebec Landscaped Median Improvements from Park Meadows Drive to County Line Road.  This is jointly funded with Lone Tree, Douglas County and Highlands Ranch Metro District.     2009 [Details]  
               
  Park Meadows Drive Reconstruction.  This project was jointly funded with Lone Tree.     2009 [Details]  
               
  Improvements of the Quebec & C-470 interchange, including widening of Quebec Street from Park Meadows Drive to County Line Road, the pedestrian bridge over C-470, and landscaping.     2008-2009 [Details]  
                     
  Widening of Chester Street Westview to County Line Road     2009    
                     
  Replacing the landscaped median in Lone Tree Parkway from Sunningdale to Limber Way     2008    
               
  Reconstruction of the Lincoln and Yosemite landscaped medians     2008    
               
  Construction of landscaped medians in Yosemite Street from C470 to County Line Road     2007    
               
  Landscaping improvements along Park Meadows Center Drive adjacent to the new Light Rail Station retaining wall     2007    
               
  Widening (Twice) of Yosemite Street from County Line Road to Maximus Drive with the City and Douglas County     2001-2005    
               
  Construction of the Lincoln and Yosemite landscaped medians     1998-2001    
               
  Construction of the C-470/Yosemite interchange with Douglas County and others     1996    
               
  Lincoln Avenue Phase III     1984-1985    
               
  County Line Road     1983-1985    
               
  [Back]                  
                     
                     
       
Copyright © 2009-2017 Park Meadows Metropolitan District